Completions

Nyogondeme

Situation plan

Bani riverside

General layout

Opening party

Opening party (marionettes)

Construction process

Room interior under construction

Mud coating process

Hangar

Veranda detail

View of the veranda

Room entrance detail

Room interior

River view from the terrace

Nyogondeme

Construction of a fair-trade touristic camp in cob and straw

Location: Sirabougou (Mali)
Year: 2008
Program: Fair-trade Hotel
Client: Voyage en Solidaire
Status: Completed
Surface: 96 m² + Exterior spaces
Cost: 26 000 € (furniture and equipment included)

Marcos G. Rojo with Marc Brunero, Clémence de Joussineau and Elisabeth de Joussineau

  • Nyogondeme

    Construction of a fair-trade touristic camp in cob and straw

    Location: Sirabougou (Mali)
    Year: 2008
    Program: Fair-trade Hotel
    Client: Voyage en Solidaire
    Status: Completed
    Surface: 96 m² + Exterior spaces
    Cost: 26 000 € (furniture and equipment included)

    Marcos G. Rojo with Marc Brunero, Clémence de Joussineau and Elisabeth de Joussineau