Completions
Turenne
Displaced/Replaced Mass. Michael Heizer, Silver Springs, Nevada, 1969
Completions
Displaced/Replaced Mass. Michael Heizer, Silver Springs, Nevada, 1969
©RodrigoApolaya
©RodrigoApolaya
©RodrigoApolaya
R+2. Housing
©RodrigoApolaya
R+2. Housing
©RodrigoApolaya
R+3. Workspaces
©RodrigoApolaya
R+4. Workspaces
©RodrigoApolaya
Attic. Housing
R+2
R+2. Axonometric view
R+4
R+4. Axonometric view
Attic
Attic. Axonometric view
GF detail
GF. Axonometric view
Cross section through workspaces
Cross section through salons
Details sheet (I)
Details sheet (II)
Details sheet (III)
R+3. Waiting area
R+3. Workspaces
R+4. Workspaces
Attic. Workspaces
Exterior corner view
Exterior lateral view (access detail)
Turenne
Transformation and energetic renovation of a faubourien housing building in a dense and historic urban environment
Location: Paris 3
Year: 2023
Program: Retail / Office / Housing
Client: Groupe OCP
Status: Not implemented
Surface: 1 100 m²
Cost: 3 021 068 € HT
A U S
Design team: Marcos G. Rojo, Karen Soto, Julien Sage-Thomas, Valère Hoguait, Pierre Augais, Sara Usai, Matilde Santiago and Katie Hoffstatter
Structure: IN4
HVAC: Maya Concept
Cost planner: DS2E
Architectural Visualization: Drama Studio and Sara Usai
Photographs: Rodrigo Apolaya
All photographs or images credits and rights belong to their author(s)
Turenne
Transformation and energetic renovation of a faubourien housing building in a dense and historic urban environment
Location: Paris 3
Year: 2023
Program: Retail / Office / Housing
Client: Groupe OCP
Status: Not implemented
Surface: 1 100 m²
Cost: 3 021 068 € HT
A U S
Design team: Marcos G. Rojo, Karen Soto, Julien Sage-Thomas, Valère Hoguait, Pierre Augais, Sara Usai, Matilde Santiago and Katie Hoffstatter
Structure: IN4
HVAC: Maya Concept
Cost planner: DS2E
Architectural Visualization: Drama Studio and Sara Usai
Photographs: Rodrigo Apolaya
All photographs or images credits and rights belong to their author(s)